Contract # | Type | Title | Expires On | Posted On |
---|---|---|---|---|
BCWS-08-23/24 | Invitation for Bids | Pump Station 004 & 022 Replacements | 2023-10-24 2:00PM | 2023-09-21 3:26PM |
Berkeley County is requesting bids for the replacement of existing Pump Station No. 004 (PS004) located at 117 Hanahan Plantation Circle, Hanahan, SC and for Pump Station No. 022 (PS022) located at 137 Weeks Avenue, Goose Creek, SC. Both stations will consist of demolition of existing facilities and replacement with a new concrete wet well top slab, submersible pumps, piping, valves, generator, controls, and appurtenances. PS022 will include a new concrete wet well. PS004 will include variable frequency drives and a flow meter. |
Contract # | Type | Title | Expires On | Posted On |
---|---|---|---|---|
BCWS-04-23/24 | Invitation for Bids | BCWS PS090 & PS096 Electrical Control Panels | 2023-10-24 11:00AM | 2023-09-18 3:27PM |
Berkeley County is requesting proposals for complete Pump Electrical Control
Cabinets capable of replacing existing field Control Cabinet. The new control cabinets will have to meet Berkeley County W&S current specifications. |
Contract # | Type | Title | Expires On | Posted On |
---|---|---|---|---|
BCWS-07-23/24 | Invitation for Bids | Central Berkeley WWTP Asphalt Replacement | 2023-10-19 11:00AM | 2023-09-18 9:06AM |
Berkeley County is requesting proposals to replace damaged/missing areas of asphalt at the Central Berkeley Wastewater Treatment Plant. The contractor will need to remove approximately 12000 square feet of rock/FLBC roadway down to sub pavement grade and resurface these areas at the facility. The work consists of furnishing all material, labor, and equipment. |
Contract # | Type | Title | Expires On | Posted On |
---|---|---|---|---|
BCWS-03-23/24 | Invitation for Bids | PS064 and PS131 Replacements | 2023-10-05 11:00AM | 2023-09-06 1:05PM |
Berkeley County is requesting bids from qualified firms for complete replacement of two pump stations, PS064 and PS131, in Berkeley County, SC. The upgrades consist of, but is not limited to, the installations of approximately 100 LF of 8” PVC SDR 26 gravity sewer pipe, approximately 40 LF of 8” PVC DR 18 and 35 LF of 6” PVC DR 18 sewer force main, CIPP lining of approximately 1,400 LF of existing 8” AC sewer force main; bypassing operations; doghouse manholes, standard manhole, and connections to existing sewer lines; pipe abandonment with flowable fill; new wet well construction, new electrical panel, new generator and pad, demolition of existing wet wells; sedimentation and erosion control: and all associated appurtenances as described in the specifications and shown in the drawings (Attachment A). | ||||
Added 2023-09-20 1:58PM: PREBID SIGN IN SHEET.pdf | ||||
Added 2023-09-08 11:14AM: Addendum 1.pdf | ||||
Added 2023-09-21 9:40AM: Michael Baker Pre-Bid Sign in Sheet.pdf |