Railroad Avenue Force Main Relocation
BCWS-18-19/20
Invitation for Bids
The Project consists of installation of approximately 1,960 LF of 6� PVC force main, 1,280 LF of 6� FPVC, 100 LF of 18� Steel Casing, (4) Air Release Valves, (3) connections to existing force mains and associated appurtenances for a complete installation. Force main installation will include cut and cover and directional drill methods as shown on the construction plans.
Created On: 2020-02-24 4:19PM
Active On: 2020-02-24 4:23PM
Expires On: 2020-03-24 11:00AM
Attached Files:You must be logged in to view attached files.
Railroad Ave Docs.pdfBCWS Railroad Ave Bid Drawings.pdfBCWS Railroad Ave FM Relocation - Addendum No.1.pdf (Added: 2020-03-16 3:50 PM)Addendum 2.pdf (Added: 2020-03-20 10:52 AM)Announcement .pdf (Added: 2020-03-23 1:05 PM)Bid Opening Tabulation Sheet.pdf (Added: 2020-03-24 12:15 PM)