Dean Hall Renovations
45202-07-19/20
Invitation for Bids
This project consists of the architectural package for Cypress Garden’s Dean Hall building. The interior demolition work for the 7000 square foot metal structure has already been completed. This work consists of the architectural, plumbing, and interior finish work.
Created On: 2020-03-25 10:12AM
Active On: 2020-03-25 10:10AM
Expires On: 2020-04-28 11:00AM
Attached Files:You must be logged in to view attached files.
IFB 45202-07-19.20 - Dean Hall Renovations.pdf (Added: 2020-03-25 11:11 AM)Addendum 1.docx (Added: 2020-04-08 3:00 PM)Addendum 2 .pdf (Added: 2020-04-23 4:20 PM)Addendum 3_.pdf (Added: 2020-04-27 4:35 PM)Addendum 4.pdf (Added: 2020-04-28 10:16 PM)Bid Tab Sheet .pdf (Added: 2020-04-30 12:29 PM)